Under the organization of the Toulouse University Hospital in medical activity centres, it was decided, in 2005, that a technical platform dedicated to the Neurosciences would be set up in the Baudot building and that research laboratories and tertiary premises would also be made available to bring together the teams of the Institut des Sciences du Cerveau de Toulouse. The renovation work is under way.

This site, called the "Baudot Neurocampus", will become operational during 2009.

Renovation work

Operation in stages:
- firm stage: 1 850 square metres including 1 460 square metres of laboratories and MRI, 390 square metres to build animal housing (new areas);
- second, conditional stage: 750 square metres of tertiary premises;
- third, conditional stage: 920 square metres of tertiary premises.

Cost: provisional cost of work: 2.2 M Euros before tax

Refurbishing subcontracts

-    Subcontract 1     Roads - Networks
-    Subcontract 2     Asbestos removal - demolition
-    Subcontract 3     Shell
-    Subcontract 4     Waterproofing
-    Subcontract 5     Cladding
-    Subcontract 6     Outside carpentry
-    Subcontract 7     Ironwork
-    Subcontract 8     Inside carpentry
-    Subcontract 9     Plastering and false ceilings
-    Subcontract 10     Flexible floor coverings
-    Subcontract 11     Hard floor coverings
-    Subcontract 12     Painting
-    Subcontract 13     High currents-low currents
-    Subcontract 14     Heating ventilation
-    Subcontract 15     Plumbing and medical fluids

Refurbishing progress

Start of work: July 2008

Photos of building work:
•    before demolition
•    start of work 23 July 2008
•    demolition progress 5 September 2008
•    end of demolition January 2009
•    start of refurbishment February 2009